July through September, 2009

Over the Summer, Gary (with a little help from Dan and Jennie) shoveled over 4 cubic yards of soil out of this area to expose and fix a leak. Then he shoveled in 4 cubic yards of gravel to replace the soil, with two layers of plastic to direct water away from the most likely leak areas. Any moisture getting below the plastic will quickly drain through the gravel and below the leak areas. The final layer was covered by one cubic yard of decorative rock. This area gets blasted by wind currents, so we decided to put in something that would not blow away! We will put in more moss rock later.